Monday, October 19, 2009
A mini
This is a portion of a series of hand pieced minis done by a wonderful long term customer. Her hand piecing amazes me. The circles are approximately 3 inches each. The green tape was used as a guide for the hand quilting. Echo quilting done every 1/4 inch.
Friday, October 16, 2009
Sailboats II
Sunday, September 6, 2009
My IBOL
Wednesday, September 2, 2009
Silk Repair
My brother-in-law, Rob, an avid antique collector found this old silk quilt. It was severely worn. In the middle there was a hole through all three layers - probably from a mouse.
I appliqued silk pieces on top of the worn areas and hand quilted the same design.
The border and binding was in good shape.
The hardest part of the project was finding the silk to applique.
I understand it is now hanging over a second story railing away from the dogs.
I appliqued silk pieces on top of the worn areas and hand quilted the same design.
The border and binding was in good shape.
The hardest part of the project was finding the silk to applique.
I understand it is now hanging over a second story railing away from the dogs.
Monday, May 25, 2009
Tuesday, May 19, 2009
One of many current projects
Friday, February 13, 2009
Finished baby quilt
Saturday, January 24, 2009
Pink/yellow baby quilt
This baby quilt is my current project. It is 42" x 60".
I started with a 4" floral block. Added 2" white strips with yellow cornerstones. Then a 2" pale pink with the same yellow cornerstones.
The quilting has begun. I chose a feathered heart for the white squares using white thread. I use soap to mark quilting lines on most fabrics. It is getting extremely hard for me to see the markings on the white. But I'm too afraid to use colored markers or pencil on the white.
Wednesday, January 21, 2009
Tee Shirt Quilt completed
This quilt is made with tee shirts all from the same college.
The only request was to use light blue fabric. The jersey
squares are hand quilted and the sashes are echoed with a
1/4" stitching. The border was also hand quilted with blue thread.
Chloe who spends 20 hours of each day hiding in my bed
took a fancy to this project.
The only request was to use light blue fabric. The jersey
squares are hand quilted and the sashes are echoed with a
1/4" stitching. The border was also hand quilted with blue thread.
Chloe who spends 20 hours of each day hiding in my bed
took a fancy to this project.
Monday, January 19, 2009
Productive Vacation
I am lucky enough to get 4 weeks vacation from my day job. Usually they are spent quilting 6 - 10 hours a day.
This morning I finished a tee-shirt quilt. I hope to finish two other projects before next Monday morning. Photos later this week.
This morning I finished a tee-shirt quilt. I hope to finish two other projects before next Monday morning. Photos later this week.
Subscribe to:
Posts (Atom)